The new wall frame can be seen in this aerial view. 09 AUG
2005
003
Electrical partially installed in the storage room. 20 SEP
2005
004
Electrical partially installed in the Refractor Bay. 20 SEP
2005
005
006
007
+++
+++
All electrical installed in the Refractor Bay. 21 SEP 2005
008
The original SPOC observatory shutter switch (and shutter motor)
will
be used to move the dome (the guy paying for the observatory has
quite a
sentimental streak). 21 SEP 2005
009
Look through the mess to see all electrical installed in the
storage
room. 21 SEP 2005
010
Mark Bloomenthal, Roger Butz and Bruce Grim erect the interior
wall. 30 SEP 2005
011
SLAS's ADA scope in its new quarters. 30 SEP 2005
012
013
+++
New workbench and shelves make for a tidier storeroom. 07 OCT
2005
014
First Patrick Wiggins cuts and drills the furring strips. 29 NOV
2005 McNeil image
015
Then Ken Harris used a 22 caliber nail gun to attach the strips to the
wall. 29 NOV
2005
016
Bruce Grim finished by grinding off the tops of the mounting
nails. 29 NOV
2005 McNeil image
017
018
019
020
+++
+++
+++
Pictures taken to later show where the furring strips are
located. 29 NOV
2005
021
022
023
024
+++
+++
+++
Ken Harris, Patrick Wiggins, Mark Bloomenthal & Bruce Grim (not
pictured) cut and
install paneling. 01 DEC
2005
025
Patrick Wiggins installs the final panel. 03 DEC
2005